Installation
Before your equipment arrives
A safe start begins before delivery day. Check these points against the manual of your exact model.
- Follow the manufacturer's manual
Prepare
Check your space
- Check the fit: the mount, the hydraulic flow and pressure, and the weight against your machine's rated operating capacity.
- For lift tables and dock equipment, check the floor or the dock is level and rated for the load, and that the power supply matches (voltage, or shop air).
- For hoists and cranes, have the beam, column or slab confirmed for the rated load before anything is hung or anchored.
- Plan the unloading: a forklift, a loader with forks or a pallet jack, on firm and level ground.
- Keep the manual, the capacity plate and the serial number where operators can read them.
Installation
Who installs it
Installation is not included in the price unless your order says so. Have it installed by a qualified installer (a licensed electrician for any electrical work), following the manufacturer's installation manual for your exact model, and keep the manual for maintenance and inspections.
- Anchored equipment (jib cranes, dock levelers, lift tables) must use the anchors and torque values the manual specifies.
- Hoists and cranes are load tested and inspected as OSHA and the ASME B30 standards require, before first use and at set intervals.
- Operators must be trained on the equipment they use, and rated capacities must never be exceeded.
Not sure your space fits?
Send us your measurements and the model; we check it with you before you order.